J <br />2. To establish top of subgrade grading, provide "point -on point" coordinates and <br />finish grade elevations on a 50 -foot grid and more frequent in irregular areas <br />and along slope grades. <br />3. Establish stake -out coordinates for the location of each subgrade location for <br />the point -on -point established grid. Subsequent surveys for the verification of <br />the prepared subgrade and subsequent vegetation soil and earthfill layer <br />surface elevations and thickness shall be located at the same point -on -point <br />grid locations, and along LFG pipe trenches and edges of prepared subgrade <br />for geomembrane cover placement, and drainage and operations layers where <br />placed, as outlined in Article 1.04 E.1. <br />4. Provide one set of offset stakes for the drainage ditches at 25 -foot intervals. <br />SHAW ENVIRONMENTAL, /Nc, <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH—Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />ILayout of Work and Surveys <br />1 01052-3 <br />5. <br />Provide verification surveys on the established point -on -point grid; provide <br />verification surveys for LFG pipe trenches and for drainage take off at <br />flowlines at 25 -foot on center and angle points for future reference and record <br />drawings. Verification surveys shall also be provided along the edge of <br />geomembrane cover placement. <br />6. <br />The verification survey data for layer surface elevations and the subgrade <br />protection layer, earthfill, vegetative soil layer, and aggregate base thicknesses <br />shall be compiled in tabular format to verify each layer point -on -point grid <br />location surface is within grade tolerance and meets minimum thickness <br />requirements, and shall be submitted to the Engineer for review prior to the <br />placement of the next component. The Engineer shall have up to 5 working <br />days to review the survey data. The Engineer's review does not relieve the <br />Contractor of the responsibility for achieving the specified grades within <br />allowed tolerances and the minimum layer thicknesses. <br />C. Anchor Trench / Liner Limit Survey <br />1. <br />Stake location of geomembrane cover limit per plan details at 50 -foot on center <br />and angle points. <br />2. <br />Provide verification survey for geomembrane cover limit location. <br />3. <br />Survey and calculate the total area on which geosynthetic material was or will <br />be placed. <br />D. Final Soil Layer and Earthfill Soil Layers Survey <br />1. <br />Upon completion of drainage layer, and subgrade protection layer layer, check <br />layer thicknesses and mark differences on Engineer approved survey markers. <br />SHAW ENVIRONMENTAL, /Nc, <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH—Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />ILayout of Work and Surveys <br />1 01052-3 <br />