Laserfiche WebLink
1. Measurement for horizontal collectors shall be per unit price per linear foot <br />quoted in the bid proposal. Payment shall be full compensation for labor, <br />materials, equipment used for trenching, placing drain rock bedding for piping, <br />installing horizontal collector piping and associated components, horizontal <br />collector drain rock backfill with compaction and doing all other work as <br />needed to install the horizontal collectors as shown on the Construction <br />Drawings and as specified here -in. <br />B. Payment <br />1. Payment for horizontal collectors shall be per unit price per liner foot quoted in <br />the bid proposal. The unit price shall include full compensation for furnishing <br />all labor, tools, equipment for trenching and installing the horizontal collectors, <br />and for doing all work involved in installing the horizontal collectors as shown <br />on the Construction Drawings and specified here -in. <br />SHAW ENV/RONMENTAL, /NC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH—Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Landfill Gas Extraction Well <br />[IM#l•'B[li <br />