Laserfiche WebLink
Drilling Company: <br />Construction Company: <br />Drilling Equipment: <br />Diameter of <br />Construction Crew: <br />Operator: <br />Boring (in.) <br />Crew Members: <br />Date: <br />Date: <br />Start Time: <br />Total Hours: <br />Start Time: <br />Stop Time: <br />Rate (ft/hr): <br />Stop Time: <br />Total (Min.): <br />Total (Min.): <br />o <br />0 a <br />.4o <br />WELL CONSTRUCTION <br />U <br />>* Ca0 <br />0 y <br />NOTES <br />Ft. <br />Depth to Top of Upper Seal <br />Ft. <br />G -Depth to Btm of Upper Seal <br />Ft. <br />F -Depth to Top of Lower Seal <br />Ft. <br />E -Depth to Btm of Lower Seal <br />Ft. <br />D -Depth to Bottom of Exp Ftg <br />Ft. <br />C -Length of Perforations <br />Ft. <br />rDepth to Bottom of Pipe <br />Ft. <br />A -Bore Depth <br />Station: <br />Northing: <br />Ref. <br />Description <br />Proposed Actual <br />Elevation: <br />A <br />Bore Depth <br />Easting: <br />B <br />Depth to Btm <br />Drilling Construction <br />C <br />Length of Perforations <br />Log Completed By: <br />D <br />Depth to Btm of Exp Ftg <br />Date: <br />E <br />Depth to Btm of Lower Seal <br />VVInd Spd + Direction: <br />F <br />IDepth to Bfin ofLower Seal <br />Weather Conditions: <br />G <br />IDepth to Bnn ofUpper Seal <br />DrillingfConshiction Log <br />LFG Well <br />IWELL NO. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CHClosureCap Ext Proj Technical Specs -4-19-12 Revl.DocReV. 0, 04/05/2012 <br />Landfill Gas Extraction Well <br />02776-11 <br />