My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:38 PM
Creation date
7/3/2020 11:05:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. 15 SLOPE STABILITY VERIFICATION (PERFORMED BY CQA MANAGER) <br />A. Prior to manufacturing geomembrane products for this project, Engineer will <br />perform and review one interface shear test each for the subgrade barrier layer <br />soil/geomembrane interface and drainage layer geocomposite/geomembrane <br />interface. Direct Shear Tests will be performed on the sample provided with <br />"submittals", in accordance with the testing procedures outlined in the CQA Plan. <br />Provide the roll and lot number from which the Geomembrane sample is taken, <br />' along with the MQC test data from that lot. The material properties of the sample <br />provided for direct shear testing will be used as a basis for accepting the material <br />provided for the project. In particular, the asperity height of the sample provided <br />will establish the manufacturer's average roll value requirement for the project and <br />supercede the value specified in Part 2 of this section. <br />' 1.16 QUALITY ASSURANCE (PERFORMED BY COUNTY) <br />A. The County will engage and pay for the services of (1) CQA Consultant and (2) <br />CQA Laboratory for monitoring the quality and installation of the geomembrane. <br />B. The Installer must aid the CQA Manager with product sampling by providing <br />personnel and equipment necessary to move, cut and protect geomembrane rolls and <br />panels. <br />1.17 CONFORMANCE TESTING (PERFORMED BY ENGINEER) <br />A. Engineer will perform conformance testing on geomembrane manufactured for this <br />project prior to installation. <br />B. Schedule 7 calendar days prior to installation for conformance tests to be performed <br />' and data to be reviewed. <br />PART 2 - PRODUCTS <br />2.01 GEOMEMBRANE RESIN <br />'. A. Use new resin products compounded and manufactured specifically for producing <br />LLDPE geomembrane. <br />' B. Do not add any post consumer resin (PCR) of any type to the formulation. <br />C. Meeting the following requirements unless otherwise approved: <br />1 SHAW ENVIRONMENTAL, INC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />1 LLDPE Geomembrane <br />02779-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.