My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:32:56 AM
Creation date
7/3/2020 11:05:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.0 Construction Certificationap ort <br /> At the completion of work, a certification report will be prepared summarizing the activities <br /> performed at the site. A draft certification report will be completed by the CQA firm and <br /> submitted to the County's Resident Engineer no more than 30 days after receipt of the completed <br /> as-built survey and will include, at a minimum,the following information: <br /> • Brief description of the project including type of facility, name of site, location, <br /> altitude, name of County, resident engineer, general contractor, and major <br /> subcontractors; <br /> Detailed description of the cover and lining systems, including surface area, cross <br /> sections, and a summary of materials used; <br /> ® Chronological summary of construction activities; <br /> • Photographic documentation, including photographs of the site at different phases of <br /> construction,photographs of construction details, and photographs of CQA operations; <br /> • General record of activities, such as dates of performance of CQA operations, number <br /> and names of CQA inspectors; <br /> • Geosynthetics manufacturer's data sheets; <br /> • Sampling and testing locations; <br /> • Copies of CQA data sheets and records completed during construction of the landfill; <br /> • CQA field and laboratory test results as well as a summary of these results; <br /> • Discussion of special problems encountered and their solutions; <br /> ' • A list and discussion of significant changes from design and material specifications; <br /> • CQA record survey (as-built) drawings (surveying and base maps required for the <br /> ' development of the record drawings are prepared by the project surveyor, and the <br /> resident engineer, CQA Engineer, CQA Monitor, and contractors must review and <br /> verify that as-builts are correct); and <br /> 1 A summary statement sealed and signed by the CQA Engineer documenting that CQA <br /> was conducted in accordance with the CQA Plan and, based on visual observations <br /> ' and data generated in accordance with the CQA Plan, the landfill and related features <br /> shown on the construction drawings were constructed in accordance with project <br /> construction drawings and specifications except as properly authorized and <br /> ' documented in the CQA Final Report. <br /> CH CQA Plan 041712 Reda.doc Q-1 <br /> 4.24.12 V <br />
The URL can be used to link to this page
Your browser does not support the video tag.