Laserfiche WebLink
® Summary of results for CQA lift thickness, density, and moisture content <br /> measurements; and <br /> ® Record of significant discussions or conferences with the County, subcontractors, <br /> CQC personnel, and others. <br /> 7.2 Construction Drawing Changes <br /> Construction drawing changes may be required during construction. Changes are only made with <br /> written agreement of the CQA Monitor, County's Resident Engineer and Contractor. These <br /> changes are made by change order to the contract. The regulatory agencies are notified by the <br /> County of significant changes. When change orders are issued, they are prepared by County's <br /> Resident Engineer with technical input from the CQA Monitor and the County's Resident <br /> Engineer will distribute change orders to the required parties for signature and execution. <br /> 7.3 Field Moisture and Density Test Result Data Sheet <br /> The CQA Monitor will record the CQA moisture content and density tests on the data sheet <br /> provided in Appendix A. <br /> 7.4 Test Report <br /> This data sheet will be used to record other CQA test results for which a specific data sheet does <br /> not exist. <br /> ' 7.5 Survey Records <br /> The CQA Monitor will review record drawings resulting from the topographic surveys <br /> performed by the registered land surveyor. Record drawings are part of the Final CQA Report <br /> issued by the CQA Engineer. The record (as-built) drawings accurately locate the constructed <br /> location of work items, including piping, overside drain locations, and invert elevations. <br /> ' 7.6 Photographic Documentation <br /> The CQA Monitor will provide photographic documentation to serve as a record of work <br /> progress, problems, and repairs. Take daily photographs of the different phases of construction <br /> being performed. Take additional photographs to document potential contractual or regulatory <br /> issues. The basic file will contain both color prints and the electronic photographs. These <br /> photographs will be available for review by the CQA Engineer, and other interested parties. <br /> Selected photographs will be reproduced as part of the final report. Photo's will have date and <br /> time stamp. <br /> CH CQA Plan 041712 Rev2a.doc 7-2 <br /> 4.14.12 <br />