My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:32:45 AM
Creation date
7/3/2020 11:05:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2013.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corral Hollow Landfill Operational Procedures Document <br /> t <br /> The flare UV scanner will be observed for proper operation and cleaned in accordance with <br /> manufacturer's specifications. <br /> The LFG blower (and electrical motor) bearings will be lubricated in accordance with the <br /> ' manufacturer's specifications. <br /> Proper operation of the automatic dialer system, alarm signal inputs (e.g., flame failure, etc.), and <br /> BFS controller set points will be verified and re-programmed, if needed. <br /> Quarterly <br /> ' Alarm signals (for blower failure, flame failure, and low temperature) will be simulated for <br /> proper operation and notification. During alarm simulation activities (where applicable) the <br /> alarm sensing equipment will be adjusted in accordance with the manufacturer's specifications. <br /> ' The air compressor oil and air filters will be replaced in accordance with manufacturer's <br /> specifications. <br /> ' The flare flame arrester will be inspected and cleaned as needed. <br /> ' Non-Routine Maintenance <br /> Non-routine maintenance will consist of corrective repairs identified during scheduled <br /> monitoring and maintenance inspections and can include: <br /> ' • Raising, re-routing or replacing LFG collection piping to ensure proper condensate <br /> drainage and vacuum distribution. <br /> • Repairing or replacing blower/flare system components. <br /> ' • Replacing damaged or non-functioning extraction well components (valves, flex <br /> connectors, sample ports). <br /> ' • Repair of main header or lateral line blockages or breaks <br /> • Repairing or replacing condensate pumps, piping and controls. <br /> 5 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.