Laserfiche WebLink
# <br /> TABLE 8A <br /> FINAL COVER EXTENSION DESIGN SUMMARY <br /> CORRAL HOLLOW SANITARY LANDFILL ENGINEERING FEASIBILITY STUDY <br /> Parameter Value <br /> Cover Area 1.3 acres <br /> Design Geosynthetic Alternative <br /> Foundation Layer 4200 cubic yards select soils <br /> Barrier Layer 57,000 square feet 40-mil LLDPE <br /> Drainage Layer 57,000 square feet Geocomposite drainage fabric <br /> Vegetative Layer 4200 cubic yards select soils <br /> Construction Duration 90 working days <br />