Laserfiche WebLink
TABLE 8B <br /> CAPITAL COST ESTIMATE SUMMARY-FINAL COVER SYSTEM EXPANSION <br /> CORRAL HOLLOW SANITARY LANDFILL ENGINEERING FEASIBILITY STUDY <br /> Parameter Unit Cost Quantity Cost <br /> Mobilization $20,000 LS $20,000 <br /> Surveying(per acre) $5,200 1.3 $6,760 <br /> Clearing/Grubbing(per acre) $2,000 1.3 $2,600 <br /> Subgrade Preparation(per square foot) $0.10 57000 $5,700 <br /> Soil Import/Borrow(per cubic yard) $10.00 8500 $85,000 <br /> Foundation Layer(per square foot) $1.00 57000 $57,000 <br /> LLDPE(per square feet) $0.65 57000 $37,050 <br /> Geocomposite Drainange Layer(per square foot) $0.65 57000 $37,050 <br /> Protective Cover Soil(per square foot) $0.55 57000 $31,350 <br /> Anchor Trench(per linear foot) $5.00 550 $2,750 <br /> Field CQA(per day) $1,275.00 75 $95,625 <br /> CQA Report $9,600 LS $9,600 <br /> Construction Subtotal $390,485 <br /> Engineering/Project Management 10% $39,049 <br /> Contingencies 5% $19,524 <br /> County Administration/Oversight 10% $39,049 <br /> Perm itting/ReguIatory Oversight 5% $19,524 <br /> Construction Total $507,631 <br />