My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_7
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2013_7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:01:31 AM
Creation date
7/3/2020 11:06:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_7
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2013_7.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1013 <br /> CAPITAL COST ESTIMATE SUMMARY-INJECTED AIR SPARGING/VAPOR EXTRACTION SYSTEM <br /> CORRAL HOLLOW SANITARY LANDFILL ENGINEERING FEASIBILITY STUDY <br /> Point of Compliance Area <br /> Parameter Unit Cost Quantity Cost <br /> Pilot Testing/Engineering $75,000 LS $75,000 <br /> IAS well installation(per foot) $65 2960 $192,400 <br /> SVE well installation(per foot) $85 1480 $125,800 <br /> Well Vaults/Control Valves $300 74 $22,200 <br /> Engineering CQA $1,200 100 $120,000 <br /> IAS Compressors $25,000 4 $100,000 <br /> SVE blowers $30,000 4 $120,000 <br /> Exhaust Treatment $20,000 0 $0 <br /> Conveyance piping installation $50 1800 $90,000 <br /> Construction Subtotal $770,400 <br /> Engineering/Construction Management 15% $115,560 <br /> Contingencies 300 $231,120 <br /> Conty Administration/Oversight 20% $154,080 <br /> Permitting/Regulatory Oversight 15% $115,560 <br /> Construction Total $1,386,720 <br />
The URL can be used to link to this page
Your browser does not support the video tag.