Laserfiche WebLink
TABLE 10C <br /> ANNUAL OPERATIONS AND MAINTENANCE COST ESTIMATE SUMMARY <br /> CORRAL HOLLOW SANITARY LANDFILL ENGINEERING FEASIBILITY STUDY <br /> Parameter HP,total hrs/d Unit No. Unit cost Cost per unit Annual Cost <br /> Energy-IAS/SVE Systems 320 24 kWH/d 5,729 $0.14 $808 $294,941 <br /> Routine O&M - - hrs/week 10 $70 $700 $36,400 <br /> Engineering support - - #/month 8 $140 $1,120 $13,440 <br /> Contingencies 20% $68,956 <br /> County Administration/Oversight 20% $68,956 <br /> Total O&M(per year) $482,693 <br />