My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_7
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2013_7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:01:31 AM
Creation date
7/3/2020 11:06:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_7
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2013_7.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 0 0 <br /> TABLE 12B <br /> CAPITAL COST ESTIMATE SUMMARY-GROUNDWATER EXTRACTION AND AIR STRIPPER SYSTEM <br /> CORRAL HOLLOW SANITARY LANDFILL ENGINEERING FEASIBILITY STUDY <br /> Parameter Unit Cost Quantity Cost <br /> Pilot Testing/Engineering $50,000 LS $50,000 <br /> Extraction well installation(per foot) $200 720 $144,000 <br /> Well Pumps and Appurtenances(each) $5,050 9 $45,450 <br /> Air Compressor(each; 16 scfm) $6,900 3 $20,700 <br /> Storage Tanks/Transfer Pumps/High Level shut-off $15,000 1 $15,000 <br /> Conveyance Piping(Air/Discharge;per foot) $25 2850 $71,250 <br /> Engineering CQA(per day) $1,600 40 $64,000 <br /> Corrugated HDPE Pipeline(per foot) $50 500 $25,000 <br /> Conveyance piping installation(per foot) $30 100 $3,000 <br /> GAC Scrubber Unit(each;optional) $5,000 1 $5,000 <br /> Permitting/Regulatory Oversight $5,000 LS $5,000 <br /> Air Stripper System Construction Subtotal $448,400 <br /> Engineering/Construction Management 10% $44,840 <br /> Contingencies 15% $67,260 <br /> County Administration/Oversight 10% $44,840 <br /> Air Stripper Construction Total $605,340 <br />
The URL can be used to link to this page
Your browser does not support the video tag.