My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2007 (1/07 - 6/07)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2007 (1/07 - 6/07)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:34:59 PM
Creation date
7/3/2020 11:06:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2007 (1/07 - 6/07)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2007 (1/07 - 6/07).tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> 1.09 CONSTRUCTION SEQUENCE <br /> A. The monitoring well shall be completed in the following sequential order. <br /> 1. The Contractor shall drill the borehole and construct the monitoring well as <br /> described in Sections 3.02 and 3.03. <br /> 2. The Contractor shall wait a minimum of 24 hours after well installation <br /> before commencing well development as described in Section 3.04. <br /> 3. The Contractor shall install the surface completion features consisting of the <br /> concrete pad and steel guard posts as described in Section 3.06. <br /> PART 2 - PRODUCTS <br /> 2.01 WELL CASING <br /> A. The well casing shall be constructed of 2-inch diameter, schedule 40, threaded <br /> polyvinylchloride(PVC) casing. <br /> 2.02 WELL SCREEN <br /> A. The 10-foot long well screen shall be constructed of 2-inch diameter, schedule 40, <br /> threaded PVC casing with 0.02-inch machine cut slots. A threaded cap shall be <br /> attached to the bottom of the screen. <br /> 2.03 SAND PACK <br /> A. The sand pack material shall consist of clean well rounded of number 2 x 12 sand, <br /> and shall be free of debris or organic impurities. <br /> 2.04 BENTONITE SEAL <br /> A. The bentonite seal shall consist of sodium montmorillonite clay in either the pellet <br /> or chip form. <br /> 2.05 NEAT CEMENT SEAL <br /> A. The neat cement seal shall consist of a mixture of Portland cement with not more than <br /> seven gallons of clean water per sack (one cubic foot or 94 pounds) of cement. <br /> Corral Hollow EMP WP.DOC Page 3 of 8 February 28,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.