Laserfiche WebLink
equipment are removed from the sites, and boring locations in clean <br />condition. <br />B. Surplus Backfill Materials: Transport and place surplus backfill materials in <br />stockpiles or place in areas as directed by the Engineer. <br />4.01 MOBILIZATION/ DEMOBILIZATION <br />Measurement — <br />Measurement for Mobilization/Demobilization shall be in accordance with section <br />1.05. <br />Payment <br />Payment for mobilization/demobilization will be based on the lump sump price <br />quoted in the bid proposal. Payment shall be full compensation for labor, <br />materials, tools, equipment overhead, and other work necessary to complete the <br />work of this section. Unless authorized in writing by the Engineer, the quantity <br />paid shall not exceed the amount shown on the proposal. <br />4.02 TRIPLE PROBE SOIL GAS WELL <br />Measurement <br />Measurement for installing soil gas wells shall be by the linear foot. Contractor <br />shall measure the depth from ground surface to the bottom of each well completed <br />with a weighted tape in the presence of the Engineer. <br />Payment <br />Payment for each soil gas wells shall be by the unit price per linear foot quoted, in <br />the bid proposal. The unit price quoted shall include full compensation for <br />furnishing all labor, materials, tools, equipment, and incidentals, and for doing all <br />the work involved in installing the triple probe soil gas monitoring well completely <br />as shown on the Construction Drawings and specified herein. <br />4.03 WELL ENCLOSURE <br />Measurement <br />Soil Gas Monitoring Well Specs San Joaquin County -Public Works <br />Foothill Sanitary Landfill & 11 Solid Waste Division <br />Corral Hollow Sanitary Landfill Printed 10/10/2007 <br />