Laserfiche WebLink
c COST ESTIMATE <br /> GROUND-WATER INVESTIGATION <br /> FRENCH CAMP LANDFILL <br /> A. INSTALL MONITORING WELLS <br /> • Start-up Scheduling Driller, $ 1,000 <br /> Ordering Supplies, and Obtaining <br /> Well Permits <br /> • Professional Services 3,300 <br /> • Drilling Subcontract 8,000 <br /> • Materials and Supplies 1,300 <br /> Subtotal $13,600 <br /> B. VADOSE ZONE SOILS ANALYSIS <br /> • Volatile Organic Compounds by EPA 8240 $ 575 <br /> • Semivolatile Organic Compounds by EPA 8270 1,035 <br /> Subtotal $ 1,610 <br /> C. INVESTIGATION REPORT $ 4,000 <br /> • Total Not-to-Exceed Cost Estimate $19,210 <br /> The following assumptions were used in developing the cost estimate: <br /> • No more than 210 feet total will be drilled for the three <br /> monitoring wells <br /> • The City of Stockton will provide elevation survey data <br /> for the monitoring wells <br /> • The City of Stockton will provide a utility clearance at <br /> each drill site <br /> • The wells will be developed and sampled under a follow-up <br /> program <br /> • The landfill operator may need to assist in grading a pad <br /> for drilling <br /> EMCON anticipates that this work will be conducted on a time-and- <br /> materials basis, in accordance with EMCON's Schedule of Charges and <br /> General Terms and Conditions. <br /> PRA 8807-03•.00D Rev. 0 08/26/88 <br />