My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1978-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1978-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 5:56:48 PM
Creation date
7/3/2020 11:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1978-1992
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1978-1992.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
635
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAC SECTION OBSERVATIONS RESULT <br /> 17677 Spreading and The perm—it amendment dated 2/01/86 C <br /> Compacting. states compaction equipment is not <br /> employed at this site. A low <br /> compaction rate of 1200 lb/yd3 is to <br /> be achieved by overburden deposition. <br /> A compaction rate of 600 lb/yd3 is to <br /> be achieved during spreading and <br /> placement. <br /> Note: The gardeners dumping area was <br /> observed to have a 15-20 foot high lift <br /> facing west, and a top area of 95 x 115 <br /> feet as measured by a rangefinder . The <br /> City of Stockton dumping area had a 15 <br /> foot lift facing north and top area of <br /> 165 x 105 feet. The lifts had intact <br /> filled plastic bags dispersed <br /> throughout them. It it questionable <br /> that a compaction rate of 600 lb/yd 3 <br /> is being reached because many of the <br /> bags were unbroken. (See slides I .1 - <br /> I.13) . <br /> 17678 Slopes and The slopes of the two working faces C <br /> Cuts. were less than five degrees (11 . 5:1.00 <br /> horizontal ratio) as measured with a <br /> clinometer, and would allow effective <br /> compaction. <br /> 17679 fir'—nal Site No area was identified as a final site C <br /> Face. face by John Giambastiani, the Site <br /> Supervisor, the day of this <br /> inspection. <br /> 17680 Stockpiling. A stockpile was not maintained at this N <br /> facility. <br /> 7- <br /> 17681 Availability of The availability of cover material-is— <br /> Cover . dependent upon haulers bringing <br /> material to the site. An adequate <br /> supply of cover material could not be <br /> substantiated through the course of <br /> this inspection. Future inspectors <br /> should verify the continued <br /> availability of imported cover. <br /> A <br /> Page No. 5 of 10 Inspector U00 at-k <br />
The URL can be used to link to this page
Your browser does not support the video tag.