My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1978-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1978-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 5:56:48 PM
Creation date
7/3/2020 11:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1978-1992
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1978-1992.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
635
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 November 20, 19901 <br />Ed Padilla <br />Senior Environmental Health Specialist <br />San Joaquin Local Health District <br />445 N. San Joaquin Street <br />Stockton, CA 95201 <br />Re: Winterization Plan for French Camp Sanitary Landfill <br />Mr. Ed Padilla: <br />The following Winterization Plan is submitted for review. <br />I. LOCATION AND DESCRIPTION OF WINTER DISPOSAL SITE <br />The location of the disposal area will be adjacent to the <br />existing dumping area at the south/west corner of the landfill. <br />The area to receive waste during this time is shown on the <br />attached map. The amount of waste to be received during the <br />winter period is based on a projected scale volume of 8,500 <br />tons for the 1990/91 winter season. <br />II. WINTERIZATION PAD AND ACCESS ROAD <br />All winter roads are in place. All roads and pad to be used <br />with the exception of roads adjacent to the working face, <br />.are asphalt with a compacted aggregate base -material. These <br />roads provide vehicles access to and from the winter pad. <br />III. DRAINAGE <br />Storm water will be directed overside to the toe of the land- <br />fill. Areas where ponding may occur; such as depressions <br />due to settlement, will be filled with cover soil to insure <br />adequate drainage from the working fill area. <br />IV. BORROW STOCKPILE <br />The stockpile of cover material is located adjacent to the <br />proposed Winter Dump area and is adequate for site needs. <br />To supplement this we also receive off site fill dirt from <br />different sources. <br />V. SUMMARY <br />This Winterization Plan is designed for seasonal operations <br />for the 1990/91 winter. <br />In addition, adequate drainage, refuse space, and cover <br />material are provided to insure limited maintenance and <br />normal operation of the landfill. <br />Th ou <br />hil iamb4Lstiani <br />res._ <br />Gambi Enterprise <br />cc: Stephen Chen, City of Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.