My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1978-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1978-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 5:56:48 PM
Creation date
7/3/2020 11:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1978-1992
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1978-1992.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
635
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be considered a significant change and may require a permit <br />revision. <br />shall3. This facility has a permitted capacity of 470 tons per day and <br />•.. receive more _. .: this amount •. <br />t first <br />obtaining F permit. <br />change in operator will require modified permit. <br />5. This revision •..the solidwastepermitsupersedes .. permit <br />originally issued on February 1, 1983. This permit has been <br />revised as a result of the 5 year permit review, and is <br />intended to update the previous permit. <br />1. This permit is subject to review by the LEA and may be <br />modified, suspended, or revoked for sufficient cause after a <br />hearing. <br />2. Safety equipment shall be used for all employees that operate <br />equipment at this including but not limited to the followings <br />a. <br />Hard hats <br />b. <br />Gloves <br />C. <br />Safety vests <br />d. <br />Hearing protection <br />e. <br />Safety shoes <br />f. <br />Dust masks. <br />1. The operator shall submit to the LEA copies of plans for the <br />closure and postclosure of the landfill for approval by the <br />LEA, Regional Water Quality Control Board, and CIWMB. These <br />plans shall be submitted not later than 180 days before the <br />five year permit review is due. The plans shall be included <br />as part of the application for the five year permit review <br />process. <br />2. In conjunction with the closure/postclosure plans, evidence is <br />to be submitted of financial ability to provide for the cost <br />of closure and 15 years of post closure maintenance. <br />u • � • � �±�i7ri3c`yj <br />The following items shall be monitored by the operator of the <br />facility or his agent. Records including but not limited to the <br />following items shall be kept and made available to the LEA at <br />intervals specified: <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.