My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1978-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1978-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 5:56:48 PM
Creation date
7/3/2020 11:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1978-1992
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1978-1992.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
635
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA Pete Wilson, Governor <br />CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD <br />8800 Cal Center Drive <br />Sacramento, California 95826 <br />13 1W RECEIVED <br />Ed Padilla JAN ' 1992 <br />San Joaquin County Environmental ENVIRONMENTALH LTH <br />Health Department PERMIT/SERVICES <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />Subject: Draft Solid Waste Facilities Permit and Permit Review <br />Report, French Camp Landfill, Facility No. 39 -AA -0002 <br />Dear Mr. Padilla: <br />I have completed my review of the subject document received <br />October 30, 1991. I have also completed my review of the revised <br />April 1990 Report of Disposal Site Information and the November <br />1988 Periodic Site Review. My comments follow: <br />Solid Waste Facilities Permit (SWFP) <br />The Findings section should identify the operator. <br />The map intended to show the general location of the <br />facility is not clear. Also the detailed map should be <br />drawn to scale, showing all on-site structures and entry <br />roads. <br />The draft permit states that the facility's total acreage is <br />73.43, the RDSI states it is 65. Please correct this <br />discrepancy. <br />Findings, Item I <br />Please note that before any of these changes can be <br />implemented the permit will need to be modified or revised <br />and appropriate CEQA review conducted. <br />- Findings, Item J includes Saturdays (November - February) in <br />the days of operation, the RDSI does not. <br />- The Findings section should include the estimated remaining <br />site life and closure year. <br />- Findings, Item 2(a) should indicate that only the April 1990 <br />RDSI conditions the permit since this will become the <br />governing document. <br />- Findings, Item 2 should include the Waste Discharge <br />Requirements, load checking program, Negative Declaration or <br />the EIR (including the State Clearinghouse Number), <br />contractual agreement between the facility operator and the <br />facility contract operator, and Land Use Permit. If no Land <br />Use Permit is required, please explain. <br />-- Printed on Recycled Paper -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.