Laserfiche WebLink
SOIL GAS PROW CONSTRUCTION FIELD AORT <br /> LOCATION: DRILLING SUMMARY: <br /> Total Depth: 13' <br /> Borehole Diameter: 7—inches <br /> Drill Crew: James Rodriguez <br /> Leo Praet <br /> STET: <br /> Steel Standpipe and Rig: CME-75 <br /> Locking Well Cover Bit(s): <br /> Drilling Fluid: N/A <br /> 2'2Top of Casing <br /> 1" Rubber Sto er surface castng: S_teel Standpipe <br /> CONSTRUCTION TIME LOG: <br /> TASK START FINISH <br /> DATE TIME DATETIME <br /> 1/4" O.D., 3/16" I.D. Teflon"' Tubing Drilling: 3/18 1130 3/18- 1150 <br /> Casing: <br /> 5'6" Type: 1" Sch. 80 PVC <br /> Amount: g 2 Geophys. Logging N/A <br /> 13' 7asing: 3/18 1150 3/18 1155 <br /> Backfill Material: <br /> Type: 6-Sack Sand Cement Grout Filter: 3/18 1 155 3/18 1200 <br /> W/3-5% Bentonite <br /> Amount: <br /> 1 Development: <br /> Seal: <br /> 1 = Type: Bentonite Pellets Seal: 3/18 1200 3/18 1205 <br /> - Amount: 2 1/2 GALS <br /> 1" Rubber Stopper Backfill: 318 1435 3/18 1438 <br /> Filter Pack: <br /> Type: Lonestor #3 and/or 2/12 Standpipe: <br /> 3/18 1438 3/181 1440 <br /> = <br /> == Amount: 140 lbs. <br /> 5' <br /> NOTES: <br /> Well Screen: <br /> a Type: 1" Sch. 80 PVC 0.02—inch Machine Slotted <br /> =-_ ~ Amount: 5dia = diameter <br /> =__ = feet <br /> Bottom Plug: " = inches <br /> Type: 1" Sch. 80 PVC Threaded <br /> Dimensions in: Feet and inches <br /> PROJECT N0. WELL N0. DATE: <br /> 394-0028-02 SGP-4 3/17/94 TET <br /> THE <br /> AM <br /> PROJECT: GEOLOGIST:FRENCH CAMP LANDFILL KEVIN CLUTTER lrww <br /> SOIL GAS PROBES DISK NO.: EST.1898 LABORATORIES , INC <br /> 39400285 FRESNO/MODESTO/VISALIA/BAKERSFIELD <br />