Laserfiche WebLink
SOIL GAS PROP CONSTRUCTION FIELD R ORT <br /> LOCATION: DRILLING SUMMARY: <br /> Total Depth: 13' <br /> Borehole Diameter. 7—inches <br /> Drill Crew: James Rodriglt.ez <br /> Leo Praet <br /> STET: <br /> Steel Standpipe and Rig: CME-75 <br /> Locking Well Cover Bit(s): <br /> Drilling Fluid: N/A <br /> 1'8' Top of Casing <br /> 6„ 1" Rubber Stoer Surface Casing: Steel Standpipe <br /> CONSTRUCTION TIME LOG: <br /> TASK START FINISH <br /> DATE TIME DATE TIME <br /> 1/4" O.D., 3/16" I.D. Teflon`" Tubing Drilling: 3 18 0850 3/18' 0910 <br /> 6, Casing: <br /> Type: 1" Sch. 80 PVC <br /> Amount: 8'6 Geophys. Logging N A <br /> 13' Casing: 3/18 0910 3/18 0915 <br /> Backfill Material: <br /> Type: 6-Sack Sand Cement Grout Filter: 318 0915 3/18 0920 <br /> W/3-5% Bentonite <br /> Amount: Development: <br /> 1' <br /> Seal: <br /> 1, Type: Bentonite Pellets Seal: 3/18 0920 3/18 0925 <br /> Amount: 2 1/2 GALS <br /> 1" Rubber Stopper Backfill: 3/18 1440 3/18 1443 <br /> =-= Filter Pack: <br /> Type: Lonestar H3 and/or 2/12 Standpipe: 3/18 1443 3/18 1445 <br /> Amount: 140 lbs. <br /> 5' <br /> NOTES: <br /> = Well Screen: <br /> A" Type: 1" Sch. 80 PVC 0.02-inch Machine Slotted <br /> :* <br /> Amount: 5' dia = diameter <br /> == = feet <br /> Bottom Plug: = inches <br /> 0' cx Type: t" Sch. 80 PVC Threaded <br /> Dimensions in: Feet and inches <br /> PROJECT NO. WELL NO. DATE: <br /> 394-0028-02THE <br /> SGP-5 3/17/94 <br /> PROJECT: GEOLOGIST: T T wtmimG <br /> FRENCH CAMP LANDFILL KEVIN CLUTTER L <br /> SOIL GAS PROBES DISK NO.: /EST.1898 L A B O R A T O R I E S , I N C <br /> 39400286 FRESNO/MODESTO/VIS"/BAKERSFIELD <br />