Laserfiche WebLink
SOIL GAS PROT CONSTRUCTION FIELD WORT <br /> LOCATION: DRILLING SUMMARY: <br /> Total Depth: 13' <br /> Borehole Diameter: 7—inches <br /> Drill Crew: James Rodrigu2 <br /> Leo Praet <br /> STET: <br /> Steel Standpipe and Rig: CME-75 <br /> Locking Well Cover Bit(s): <br /> Drilling Fluid.. N/A <br /> 119 Top of Casing <br /> 1" Rubber Sto er surface casing: Steel Standpipe <br /> CONSTRUCTION TIME LOG: <br /> TASK START FINISH <br /> DATE TIME GATE TIME <br /> 1/4" O.D., 3/16" I.D. Teflon'" Tubing Drilling: 3/18 0925 3 18 0945 <br /> 6, Casing: <br /> Type: 1" Sch. 80 PVC <br /> Amount: 8,g.. Geophys. Logging N/A <br /> 13' Casing: 3/18 0945 3/18 0950 <br /> Backfill Material: <br /> Type: 6-Sock Sand Cement Grout Filter: 3/18. 0950 3/18 0955 <br /> W/3-5% Bentonite <br /> Amount: Development: <br /> 1' <br /> Seal: <br /> Type: Bentonite Pellets Seal: 3/18 0955 3/18 1000 <br /> Amount: 2 1/2 GALS <br /> Backfill: 3/18 1400 3/18 1403 <br /> 1" Rubber Stopper <br /> Filter Pack: <br /> '== Type: Lonestar #3 and/or 2/12 Standpipe: 3/18 140313/18114051 <br /> Amount: 140 lbs. <br /> 5' -`- <br /> NOTES: <br /> Well Screen: <br /> Type: 1" Sch. 80 PVC 0.02—inch Machine Slotted <br /> ==== Amount: 5' dia = diameter <br /> ' = feet <br /> Bottom Plug: = inches <br /> of Type. 1" Sch. 80 PVC Threaded <br /> Dimensions in: Feet and inches <br /> PROJECT NO. WELL NO. DATE: <br /> 394-0028-02 /T-.LABORATORIES <br /> THE <br /> SGP-6 3/17/94 <br /> PROJECT: GEOLOGIST: ET wimin FRENCH CAMP LANDFILL KEVIN CLUTTER <br /> SOIL GAS PROBES DISK NO.: , INC :' <br /> 39400287 FRESNO/MODESTO/VISALIA/BAKERSFIELD <br />