Laserfiche WebLink
r <br /> Monitoring Report Compliance Chec list 3 <br /> Discharges Regulated by Title 27 and/or Part 258 <br /> RWQCB <br /> Reference Parameter Yes No N/A Reviewer Comment <br /> WDRs/MRP/ Groundwater Monitoring <br /> Standard <br /> Provisions 1. Are all groundwater Field Parameters X <br /> (1993,1997,2000) Monitoring Parameter, and COCs <br /> (if required)samples and analyzed? <br /> in. Have any groundwater concentration X MW-lA, -2, -6A, -9A,&-9B <br /> limits been exceeded? If yes, identify equal or exceeded 1 or more <br /> in comments. inorganic parameter. MW-913, <br /> &—lA detected 1 or more <br /> n. Is there a description and graphical Iorganic parameter. <br /> presentation of groundwater flow X <br /> direction and gradient? <br /> o. Monitoring Wells: Is there a <br /> description,method, and time X <br /> of water level measurement and <br /> well recovery time? <br /> p. Purging: Is there a description X <br /> of the purging method,purge <br /> pump and its placement,and <br /> field parameters? <br /> WDRs Annual Monitoring Report(when applicable) <br /> Standard <br /> Provisions q. Are all monitoring parameters X <br /> (1993,1997,2000) and COCs graphed so as to show <br /> historical trends at each Monitoring <br /> Point and Background Monitoring <br /> Point? <br /> X Not required for a quarterly <br /> r. Is all monitoring analytical data report. <br /> obtained in the last year presented <br /> in tabular form as well as on a 3.5" <br /> diskette? <br /> X <br /> s. Is there a comprehensive discussion <br /> of the compliance record and the <br /> result of any corrective actions? <br /> t. Is there a map showing the area X Waste is no longer discharged at <br /> _ and elevations in which filling has the French Camp facility. <br /> been completed during the past year <br /> and comparison to final closure <br /> contours? <br />