Laserfiche WebLink
Monitoring Report Compliance Checklist 4 <br /> Discharges Regulated by Title 27 and/or Part 258 <br /> Reference Parameter Yes No N/A Reviewer Comment <br /> WDRs u. Is there a summary of the monitoring X <br /> Standard results indicating any changes made <br /> Provisions or observed since the previous annual <br /> (1993,1997,2000) report? <br /> X French Camp does not have an <br /> v. Is there an evaluation of the LCRS. <br /> effectiveness of the leachate <br /> monitoring/control facilities? <br /> X French Camp does not have an <br /> Standard w. Is there a discussion about the LCRS. <br /> Provisions annual LCR S testing and a <br /> (April 2000) comparison to earlier testing? <br /> or check WDRs <br /> Compliance Achieved? (check one) Yes x No <br /> If No, check all issues that apply and provide comments: <br /> Incomplete transmittal letter Comments (to be entered into SWIM <br /> Incomplete report <br /> Inadequate monitoring program <br /> New release <br /> Inadequate response to evidence of a release <br /> WDRs violation other.than listed above <br /> Other(explain in comments) <br /> Additional Comments and Recommendations: <br /> VOC impacts at MW-IA may be attributed to the being screened in waste. VOC impacts in other wells are likely due <br /> to landfill gas. <br /> The facility is out of compliance due to existing impacts to groundwater,there is no evidence of new impacts. The <br /> initial phase of corrective action for groundwater impacts is capping the landfill. A final closure plan for French Camp <br /> LF has been approved,however closure has been held up to consider site re-development. <br /> RWQCB Staff Signature: <br /> Date: 14 November 2005 <br />