CENTRAL VALLEY REGIONAL WATER QUALITY CONTROL BOARD <br /> INSPECTI PORTf <br /> GATE: 31 October 2006 <br /> FACILITY: Forward Landfill <br /> DISCHARGER: Forward Inc. <br /> LOCATION & COUNTY: 9999 S. Austin Rd. Manteca, San Joaquin County <br /> CONTACT(S): Kevin Basso and Ruben Ramirez <br /> INSPECTION DATE: 25 October 2006 <br /> INSPECTED BY: Ross Atkinson <br /> ACCOMPANIED BY: Ruben Ramirez <br /> SUMMARY: This inspection was the final construction inspection for new cell FU-06. The <br /> construction of the new cell is complete with a LCRS gravel and operations layer in place on the <br /> cell bottom and approximately 10 feet up the side slope. They will install operations layer soil <br /> p the side slope as the unit fills. The operations manager reports that the final electronic leak <br /> etection test has been completed and the liner system passed the test. The construction of <br /> the unit looks good, as we have come accustomed to at this facility. Photos of the complete cell <br /> were taken but did not turn out due to problems with the old digital camera staff used. <br /> Forward has completed their storm water preparations for the rainy season; selected areas <br /> were hydroseeded as needed and storm water control structures maintained. Moisture <br /> measurement equipment has been installed at two locations on the new north slope of the <br /> Austin Road unit ET cover. The equipment will document performance of the test cover for the <br /> next two years. No violations were noted. <br /> Ross Atkinson <br /> Associate Engineering Geologist <br /> CIWQS Inspection#847417 <br /> 0 <br /> Approved. <br />