Laserfiche WebLink
• <br />0 <br />Inspection Report Comments: <br />Notes: <br />A. The landfill gas extraction flare was operating at time of inspection. <br />B. Top of the southeast side of the primary site has been re -graded and a down drain installed (previous AC cleared). <br />C. According to operator West Backhoe Services is scheduled to begin re-grading/filling the center roadway between the <br />primary <br />and secondary sites on Monday, September 27th. This work should be completed in October. <br />D. Burrow holes observed at east slope of primary site and at west slope at secondary site. Make necessary repairs of <br />burrow holes <br />and take measures to prevent further burrowing. <br />