My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1999-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1999-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 10:11:26 AM
Creation date
7/3/2020 11:08:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1999-2002
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCLUSIONS <br /> The monitoring results show that migration of methane concentrations greater than 5% is present <br /> in only one probe (the deep probe of GW-3). Past quarters have shown gas levels above 5% in <br /> all the wells along the labor camp (GW-1 to GW-3), and in GW-12. Detections below the 5% <br /> limit occurred in various wells, including these, during the Fourth Quarter Monitoring Event. <br /> Steps are being taken to address the exceedence in GW-3 and reduce the amount of migration in <br /> the other wells showing traces of migration. The county is in the process of retaining the services <br /> of an engineering consulting firm to evaluate the current conditions at the Harney Lane Sanitary <br /> Landfill. Meanwhile, adjustments are continuously being made to run the system more <br /> efficiently and control gas migration. Per your request, an expeditious time-line detailing the <br /> County's intentions for the remediation of the continued gas migration exceedence is currently <br /> being drafted and will be submitted to your office in a timely manner. <br /> Monitoring will continue with the next monitoring event in January 2001. Further monitoring <br /> will help determine if the gas control system is working efficiently. <br /> N:\Najee\HI\Gas\4th2OOOgas.wpd <br /> 5 <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.