My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1999-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1999-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 10:11:26 AM
Creation date
7/3/2020 11:08:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1999-2002
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 REGRADING WORKPLAN <br /> 2.1 Objective <br /> The objective of this work is to regrade areas of the top surface of the HLSL where settlement <br /> has decreased the surface drainage grade to below three percent. <br /> This work will not involve any modification or penetration of the final cover's low-hydraulic- <br /> conductivity layer. Therefore, a Construction Quality Assurance plan,per Title 27, Section <br /> 21090(b)(1)(E), is not required. <br /> 2.2 Pre-Construction Activities <br /> 2.2.1 Topographic Survey <br /> The initial task will be to survey the existing top surface of the HLSL. This survey will include <br /> the entire footprints of both the primary and secondary sites located at the HLSL(Figure 2). <br /> From this topographic survey, the County will determine all areas along the top surface that <br /> require regrading. <br /> 2.2.2 Grading Plan <br /> A grading plan will be prepared from the above topographic survey. This grading plan will <br /> include: <br /> • Drawings which locate the areas that will be repaired <br /> • Proposed new grades of the HLSL. <br /> • Quantities of soil necessary to complete regrading activities <br /> • Grading stakes in areas where regrading is necessary <br /> 2.2.3 Contractor Procurement <br /> Due to the magnitude of this work, the County will seek to hire a contractor to regrade the top <br /> surface of the HLSL. The process of hiring the contractor will include the following: <br /> • Acceptance of the project by the Board of Supervisors (BOS) <br /> • Advertisement and bid opening of the project <br /> • Acceptance of the successful bidder by the BOS <br /> Final Cover Regrading Workplan County of San Joaquin <br /> Harney Lane Sanitary Landfill Public Works Dept. <br /> April 25,2002 2-1 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.