My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> 2 PROGRAM OVERVIEW <br /> 2.1 GENERAL <br /> This CQA plan is to be implemented to control construction for installation of final cover <br /> for the Landfill. The final cover consists of a minimum two-foot thick foundation layer, <br /> one-foot thick low permeability barrier ("clay") layer and a one-foot thick protective <br /> - vegetative layer. This final cover section was included in the Closure Plan to meet <br /> minimum requirements of Chapter 15, Section 2581(a). <br /> The County has decided to use on-site soils from a borrow area for construction of the final <br /> cover as indicated in the closure plan. The SJDPW retained Kleinfelder to test available <br /> on-site soil and develop a soil amendment mix design to attain the properties needed for <br /> barrier layer construction. The mix design is based on using commercial clay soil obtained <br /> from Ione Refractories and is included in this CQA Plan. <br /> I IL The CQA program also involves using qualified SJDPW personnel to the greatest extent <br /> possible for the following: <br /> • construction of the final cover, <br /> Lengineering closure design services, <br /> • CQA testing and certification of the foundation and vegetative layers, <br /> • construction supervision of County forces, <br /> L <br /> grade control survey, and <br /> �` certification of the foundation and vegetative layer construction. <br /> r- <br /> f . <br /> L If SJDPW forces are not available, qualified contractors will be retained to perform the <br /> work. <br /> L <br /> r <br /> -0 <br /> r <br /> CR9-42 Page 5 of 28 <br /> Copyright 1991 Kteinfetder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.