My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> Kleinfelder Inc. will act as a third party Construction Monitor which will include the <br /> following services: <br /> • part-time observation of the borrow operations, <br /> • coordination and training of SJDPW field engineers in CQA testing of the <br /> foundation layer, <br /> • part-time construction observation for the foundation layer, <br /> • limited CQA testing of the foundation layer, <br /> • full-time construction observation and total CQA testing of the test pad, <br /> • part-time construction observation and total CQA testing of the barrier layer, <br /> part-time construction observation of the vegetative layer, and <br /> • preparation of the Final CQA report and certification of the barrier layer <br /> �- construction. <br /> L <br /> The SJDPW will serve as the Engineer of Record for site closure and grade control for the <br /> final cover. Kleinfelder will act as construction monitor for meeting the requirements of <br /> [[ Section 17774, Title 14. <br /> l� <br /> The specific testing, monitoring and documentation procedures are called out in <br /> Ea_ <br /> appropriate sections which follow. <br /> ( ' 2.2 REGULATORY REQUIREMENTS <br /> Both the CIWMB and the RWQCB regulate landfill capping activities. Title 14, Chapter 3 <br /> of the California Code of Regulations is used by the CIWMB. Title 23, Chapter 15 of the <br /> California Code of Regulations is used by the RWQCB. Appendix A contains copies of <br /> both sets of regulations. <br /> I <br /> CR9-42 Page 6 of 28 <br /> LCopyright 1991 Kleinfelder, Inc. AIN <br />
The URL can be used to link to this page
Your browser does not support the video tag.