Laserfiche WebLink
KLEINFELDER <br /> have been properly evaluated, documented and approved by the regulatory authorities. <br /> The Engineer of Record must be a Registered Civil Engineer in the State of California. <br /> Mr. Gabriel Karam P.E.will be the Engineer of Record for the project. <br /> 3.2.4 Survey Team <br /> The Survey Team performs all survey work on the site to measure and document the <br /> following: <br /> • Configuration of landfill prior to placing cap <br /> • Configuration of upper surface of foundation layer <br /> • Confirms that foundation layer is a minimum of 2-feet thick <br /> • Confirms grade slope of upper surface of foundation <br /> IConfirms that the low permeability layer is a minimum of 1-foot thick <br /> • <br /> Confirms grade slope of upper surface of low permeability layer <br /> • Confirms that the vegetation layer is a minimum of 1-foot thick <br /> The survey team for the project will be the Surveyor's Division of SJDPW or the solid <br /> waste division survey crew under direct supervision of the Project Engineer. Should <br /> County forces be unavailable to meet the project schedule, the SJDPW may hire a qualified <br /> land surveyor contractor to perform surveys. The contractors' survey crew will be under <br /> L direct supervision of a registered surveyor (California Registration) in the firm and will <br /> work under direction of the Project Engineer. <br /> E <br /> 3.2.5 Construction Monitor, Support Engineers <br /> The Construction Monitor, Support Engineers will assist the CQA Officer in performing <br /> Cry internal quality assurance of project design and documents. These engineers are <br /> L Mr. Mark Urquhart P.E. and Mr. Timothy Crandall P.E.. These engineers assisted with <br /> compilation of this CQA Plan and will review CQA results and documents for accuracy and <br /> E." conformance with the goals of the project. <br /> 10 <br /> CR9-42 Page 11 of 28 <br /> LCopyright 1991 Kleinfelder, Inc. <br />