My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> have been properly evaluated, documented and approved by the regulatory authorities. <br /> The Engineer of Record must be a Registered Civil Engineer in the State of California. <br /> Mr. Gabriel Karam P.E.will be the Engineer of Record for the project. <br /> 3.2.4 Survey Team <br /> The Survey Team performs all survey work on the site to measure and document the <br /> following: <br /> • Configuration of landfill prior to placing cap <br /> • Configuration of upper surface of foundation layer <br /> • Confirms that foundation layer is a minimum of 2-feet thick <br /> • Confirms grade slope of upper surface of foundation <br /> IConfirms that the low permeability layer is a minimum of 1-foot thick <br /> • <br /> Confirms grade slope of upper surface of low permeability layer <br /> • Confirms that the vegetation layer is a minimum of 1-foot thick <br /> The survey team for the project will be the Surveyor's Division of SJDPW or the solid <br /> waste division survey crew under direct supervision of the Project Engineer. Should <br /> County forces be unavailable to meet the project schedule, the SJDPW may hire a qualified <br /> land surveyor contractor to perform surveys. The contractors' survey crew will be under <br /> L direct supervision of a registered surveyor (California Registration) in the firm and will <br /> work under direction of the Project Engineer. <br /> E <br /> 3.2.5 Construction Monitor, Support Engineers <br /> The Construction Monitor, Support Engineers will assist the CQA Officer in performing <br /> Cry internal quality assurance of project design and documents. These engineers are <br /> L Mr. Mark Urquhart P.E. and Mr. Timothy Crandall P.E.. These engineers assisted with <br /> compilation of this CQA Plan and will review CQA results and documents for accuracy and <br /> E." conformance with the goals of the project. <br /> 10 <br /> CR9-42 Page 11 of 28 <br /> LCopyright 1991 Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.