My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> 6 CONSTRUCTION <br /> 6.1 TEST PAD <br /> The test pad foundation and low permeability layers will be compacted with the same type <br /> of equipment designated for construction of the final cover to determine whether the <br /> specified moisture/density and density/permeability relationships determined in the <br /> laboratory can be achieved in the field with the designated compaction equipment and the <br /> specified lift thickness. <br /> The location of the low permeability test pad will be selected by the County Project <br /> Manager with the concurrence of the CQA Officer. The test pad will be approximately 40 <br /> y feet by 40 feet, so constructed and placed that construction equipment can reach normal <br /> operating speed before it reaches the test pad, and with sufficient space at the far end of <br /> the test pad that equipment can maintain normal operating speed all the way across the <br /> test pad. The width of the top of the test pad shall be not less than three times the width of <br /> the widest piece of equipment used. <br /> 6.2 CONSTRUCTION OF THE FINAL COVER <br /> FF6.2.1 Foundation Layer <br /> The foundation layer fill shall be on or off site materials meeting the requirements of <br /> L Chapter 15, and shall be placed in lifts not exceeding 8 inches in loose depth. The <br /> completed foundation layer shall be not less than 2-feet thick. Compaction of the lower <br /> Lfoot shall be to the maximum practical based on optimum moisture content. The upper <br /> foot of the foundation layer shall be compacted to at least 90 percent of maximum dry <br /> Ldensity as defined by ASTM D 1557. Where the lower one foot of the foundation layer is <br /> already in place as temporary cover, it may be compacted in place to the maximum <br /> practical density. <br /> L <br /> l <br /> L <br /> CR9-42 Page 18 of 28 <br /> LCopyright 1991 Kteinfetder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.