kn KLEINEELDER <br /> 5.3 QUALITY CONTROL <br /> Assurance of the quality of construction requires that field tests be developed to identify <br /> appropriate construction procedures, equipment, and the material that is to be used. <br /> Based on these tests, the procedures and equipment may vary with changing fill material <br /> and site conditions. <br /> Assurance of the quality of construction includes advising the construction personnel of the <br /> necessity for exact fulfillment of design requirements and the consequences of inadequate <br /> workmanship. Construction personnel will also be made aware that requirements for <br /> compactive effort are more rigid when permeability and density criteria must be met than <br /> they are when density criteria alone must be met. Construction personnel should <br /> r- <br /> understand that compactive effort sufficient to produce passing dry density tests may not be <br /> sufficient to produce practical minimum attainable permeability for that density. <br /> Construction personnel should also understand that their prime purpose in constructing the <br /> 1_. compacted low permeability soil cover is to achieve minimal permeability and that to this <br /> end the acceptable clod size for the attainment of minimal permeability is significantly <br /> - smaller than is acceptable to obtain adequate dry density on other types of projects. <br /> Construction operations should comply with Section 24 of Caltrans Standard Specifications <br /> Tegarding particle size. <br /> Throughout construction, the progress of the work will be monitored and measured to <br /> check that the work is proceeding as planned. Any changes to planned procedures must be <br /> E, approved and documented by the Engineer. <br /> In order to evaluate the construction equipment and methods to be used to construct the <br /> L impermeable soil cover to the requirements of Chapter 15, Title 23, CCR, a trial low <br /> permeability cover section (test pad) will be constructed. <br /> The cover test section will be used to test the Contractor's proposed equipment for the <br /> IL number of passes required to obtain the specified compaction at a moisture content of 3 <br /> percent wet of optimum or greater. <br /> 0 <br /> CR9-42 Page 17 of 28 <br /> fCopyright 1991 Kleinfelder, Inc. <br />