My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kn KLEINEELDER <br /> 5.3 QUALITY CONTROL <br /> Assurance of the quality of construction requires that field tests be developed to identify <br /> appropriate construction procedures, equipment, and the material that is to be used. <br /> Based on these tests, the procedures and equipment may vary with changing fill material <br /> and site conditions. <br /> Assurance of the quality of construction includes advising the construction personnel of the <br /> necessity for exact fulfillment of design requirements and the consequences of inadequate <br /> workmanship. Construction personnel will also be made aware that requirements for <br /> compactive effort are more rigid when permeability and density criteria must be met than <br /> they are when density criteria alone must be met. Construction personnel should <br /> r- <br /> understand that compactive effort sufficient to produce passing dry density tests may not be <br /> sufficient to produce practical minimum attainable permeability for that density. <br /> Construction personnel should also understand that their prime purpose in constructing the <br /> 1_. compacted low permeability soil cover is to achieve minimal permeability and that to this <br /> end the acceptable clod size for the attainment of minimal permeability is significantly <br /> - smaller than is acceptable to obtain adequate dry density on other types of projects. <br /> Construction operations should comply with Section 24 of Caltrans Standard Specifications <br /> Tegarding particle size. <br /> Throughout construction, the progress of the work will be monitored and measured to <br /> check that the work is proceeding as planned. Any changes to planned procedures must be <br /> E, approved and documented by the Engineer. <br /> In order to evaluate the construction equipment and methods to be used to construct the <br /> L impermeable soil cover to the requirements of Chapter 15, Title 23, CCR, a trial low <br /> permeability cover section (test pad) will be constructed. <br /> The cover test section will be used to test the Contractor's proposed equipment for the <br /> IL number of passes required to obtain the specified compaction at a moisture content of 3 <br /> percent wet of optimum or greater. <br /> 0 <br /> CR9-42 Page 17 of 28 <br /> fCopyright 1991 Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.