My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> (g) The measurement for thickness of soil liner shall take into account the sheepsfoot <br /> indentions of the upper lift. <br /> (h) In any area where heavy construction equipment cannot be used, a pure imported <br /> clay soil will be required. Compaction of soil along the edge of any construction <br /> appurtenances shall be achieved by hand application and hand compaction of the <br /> soil. At this time, there are no known construction appurtenances at the site. <br /> (i) The location and frequency of field and laboratory testing shall be as set forth in <br /> Section 7.2 or as modified by the CQA monitor. <br /> (j) Any materials which after placement and compaction do not meet design criteria <br /> shall be reworked or removed and replaced to meet specification. <br /> (k) The compacted soil liner shall have a permeability of 1x10-6 cm/sec or less. <br /> (1) During construction, finished lifts or sections of compacted barrier layer shall be <br /> _.: sprinkled with water as required to prevent drying and desiccation prior to <br /> application of the vegetative layer. The vegetative layer shall be placed as soon as <br /> possible after completion of compaction as approved by the Engineer and CQA <br /> officer. <br /> i' <br /> 6.2.3 Vegetative Layer <br /> c <br /> Available onsite soils will be used to construct the vegetative layer. Soils with a high sand <br /> content will not be used due to their susceptability to erosion and desiccation. The <br /> vegetative layer will be at least one-foot thick and will be compacted to a density of 80 to <br /> r 85 percent. Higher levels of compaction will not be accepted since the growth of <br /> vegetation may be inhibited. The plant seed shall be applied as soon as possible after <br /> completion of the vegetative layer or a section of the vegetative layer. <br /> i" <br /> 6.3 Results from Test Pad <br /> Kleinfelder will evaluate the data from testing and develop minimum specifications for the <br /> construction of the barrier layer. The results of the test pad and the construction <br /> procedures and specifications recommended by Kleinfelder will be in the form of a letter <br /> LO <br /> CR9-42 Page 21 of 28 <br /> Copyright 1991 Kleinfelder, Inc. <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.