My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 KLEINFELDER <br /> 7 QA/QC TESTING AND MONITORING <br /> 7.1 GENERAL <br /> The construction monitoring and QA/QC testing of the foundation layer will be primarily <br /> performed by the SJDPW Engineer and Field Engineers. Kleinfelder will assist with this <br /> monitoring. Kleinfelder will perform all monitoring and QA/QC testing of the test pad <br /> and barrier layer of the final cover. This will include part time monitoring of barrier layer <br /> construction should CDPW forces perform construction. Should the SJDPW hire an <br /> outside earthwork contractor to construct the test pad and barrier layer, Kleinfelder will <br /> provide full time construction monitoring. This workplan is based on the estimate that <br /> SJDPW forces take 6 months to install the barrier layer, and that an outside earth work <br /> contractor using a larger equipment fleet would reduce the time to one month. <br /> 7.2 QA/QC TESTING <br /> The tests to be used are shown in Table 7-1. For the most part they are standard ASTM <br /> tests as shown. The Sealed Double Ring Infiltrometer (SDRI) test will be carried out using <br /> t a circular Kleinfelder modification of the Trautwein square SDRI. <br /> Table 7-2 shows the monitoring test methods. This table outlines the construction <br /> observations in more detail and indicates the elements to be observed. <br /> Table 7-3 shows the frequency of field and laboratory testing and observations for both the <br /> Test Pad, and the final cover. <br /> Table 7-4 shows the pass/fail criteria for soil properties including moisture, density, <br /> `L percent passing #200 sieve and permeability. <br /> 7.3 CONSTRUCTION MONITORING <br /> Kleinfelder personnel will visit the site on each day that construction is in progress. The <br /> number of hours that Kleinfelder staff spend at the site each day will be determined by the <br /> F rate of progress of the construction work. The Kleinfelder QA/QC technician will perform <br /> L01 <br /> CR9-42 Page 23 of 28 <br /> Copyright 1991 Kleinfelder, Inc. <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.