Laserfiche WebLink
kn KLEINFELDER <br /> the necessary geotechnical tests or tasks in accordance with the Frequency of Testing <br /> schedule as set forth on Table 3. Test results and observations will be recorded on <br /> standard forms. An outline of Kleinfelder Standard Forms is given in Appendix C. <br /> A weekly report will be prepared which will summarize the results of testing for the <br /> previous week. This summary report will be prepared by the supervising technician or <br /> engineer and reviewed by the QA/QC officer. <br /> �J <br /> II <br /> CR9-42 Page 24 of 28 <br /> j Copyright 1991 Kleinfelder, Inc. <br /> L <br />