My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINEELDER <br /> 9 NONCONFORMANCE <br /> Any deficiencies or failed tests shall be recorded on the daily log. Deficiencies or failed <br /> areas that are corrected and retested that day shall be marked as corrected on the daily log <br /> and no separate Nonconformance Report is required. <br /> When a tested area of deficiency or nonconformance has not been brought into <br /> conformance, or has not been tested for conformance by the QA/QC technician by the <br /> time the technician leaves the site for the day, a separate Nonconformance Report shall be <br /> written. <br /> An area of nonconformance shall not be left more than five days without being brought <br /> into conformance, unless approved by the Engineer. In the case of delayed conformance, a <br /> a Delayed Conformance Report shall be prepared by the QA/QC technician and kept in a <br /> separate file. <br /> After bringing an area to conformance, the conformance shall be recorded on the daily log <br /> and on the original Nonconformance Report and Delayed Conformance Report with the <br /> date of conformance and the confirming test results. <br /> In the event of a failing test, all material for the lift being tested extending to the adjacent <br /> passing tests shall be removed and/or reworked until passing tests are obtained. At least <br /> two passing tests shall be obtained in each reworked area for each failing test. <br /> L <br /> I , <br /> LO <br /> CR9-42 Page 27 of 28 <br /> Copyright 1991 Kteinfetder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.