My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> PATRICK C. DELL <br /> Project Engineer <br /> Education <br /> BS Civil Engineering, Brigham Young University, Provo, Utah, 1981 <br /> Geotechnical Engineerin , California State University, Sacramento, <br /> California (MS in progress <br /> Registration <br /> Civil Engineer, 42018, California, 1987 <br /> Summary of Experience <br /> Mr. Dell has experience in various aspects of civil engineering including geotechnical <br /> engineering, materials testing, surveying and subdivision design. He has been involved in <br /> numerous large commercial and industrial developments. He also has had experience in <br /> testing and design of flexible pavements for several airfields in Northern California. Mr. Dell <br /> has also performed slope stability analyses for levees bordering several large residential <br /> Amok developments in the Stockton area. Mr. Dell has extensive experience in construction testing <br /> and observations. <br /> 1987 -Present Project Engineer, Kleinfelder, Inc., Stockton, California <br /> Duties include performing geotechnical engineering investigations for a <br /> wide variety of projects. Supervises project organization, field <br /> explorations, laboratory testing and final report preparation. Extensive <br /> experience in residential developments, shopping centers, commercial <br /> buildings, air fields, pavement evaluations, industrial complexes, schools <br /> and slope stability studies. <br /> 1981 - 1987 Staff Engineer, Laver L. Roper &Associates <br /> Duties included supervision of materials testing laboratory, laboratory <br /> tests, personnel, calculation, and analysis. Supervisor of field technicians, <br /> field operations, scheduling, trouble shooting, analysis of field tests. <br /> Engineering design, pavement design, and concrete-mix design. <br /> June 1983 to January 1985, Staff Engineer in charge of Chico, California <br /> field office. Duties included coordinating field operations, performing <br /> field tests on soils, steel, and concrete, engineering design, and test report <br /> writing. <br /> 0 <br /> G10893 (8/90) 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.