Laserfiche WebLink
KLEINFELDER <br /> MARK UIOQ 1,P.E. <br /> Senior Project Engineer <br /> ash disposal facility. The project currently is in local permitting and the California <br /> Environmental Quality Act (CEQA) environmental assessment stages. This included <br /> appearances before the Sutter County Planning Commission for a land use zoning <br /> determination. <br /> o Corral Hollow Sanitary Landfill, San Joaquin County, California <br /> As project manager for design, permitting, and regulatory compliance, prepared <br /> Report of Disposal Site Information, Report of Waste Discharge, and Five-Year <br /> Engineering Review, Hazardous Waste Exclusion Program, and oversaw <br /> development, approval, and implementation of air and water Solid Waste <br /> Assessment Tests (SWATs) and Subchapter 15 monitoring plan for this 150TPD <br /> Class II-2 landfill. <br /> o Auto Shredder Waste Disposal Site, Cove Contractors, Stockton, California <br /> Served as project manager and engineer for preparation of a Report of Waste <br /> Discharge, Report of Disposal Site Information and Periodic Engineers Review <br /> Report for the landfill. The reports included conceptual closure plans, ground water <br /> and vadose zone modeling of contaminant transport, and a remediation feasibility <br /> study. <br /> o Foothill Sanitary Landfill, San Joaquin County, California <br /> As project manager for site design, permitting, and regulatory compliance, prepared <br /> Report of Disposal Site Information, Five-Year Engineering Review, Report of <br /> Waste Discharge, and Design and Operations Plan, and oversaw development and <br /> approval process of air and water SWATs and Subchapter 15 detection monitoring <br /> program for this 300TPD Class III landfill. Current project work includes <br /> preparation of overall site preliminary design plans and final design of the first lined <br /> landfill unit for the 800 acre site. <br /> o Harney Lane Sanitary Landfill, San Joaquin County, California <br /> Prepared operations plans, plans and specifications for computerized scale system, <br /> and Hazardous Waste Exclusion Program. Oversaw development, approval process, <br /> and implementation for Subchapter 15 closure, ground water monitoring plans, and <br /> Calderon air SWAT. As site engineer for operations and closure of this 350TPD <br /> Class III landfill, he oversaw field operations and performed engineering required <br /> for closure implementation. Recently oversaw preparation of a ground water SWAT <br /> proposal, SWAT report, and slope stability analysis for the landfill. <br /> E21398(08/91) 3 <br />