My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-1008-49.001 <br /> June 22, 1993 <br /> age 2 of 4 <br /> TABLE I <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Dry laboratory Specified <br /> Test Moisture Density Compaction Relative Relative <br /> No. Date Test Location % Dry Wt. P.C.F. Curve No. Compaction Compaction <br /> Test Pad Foundation Laxer <br /> 6 04/21 Retest #1 18.3 109 1 90 90 <br /> 7 04/21 Retest #3 13.3 112 1 93 90 <br /> 8 04/21 Retest #4 15.0 112 1 93 90 <br /> ML Test Pad <br /> 9 04/27 10' west and 25' north of <br /> southeast corner 15.9 114 2 100 95 <br /> 10 04/27 10' west and 75' north of <br /> southeast corner 18.4 109 2 95 95 <br /> 11 04/27 10' west and 125' north of <br /> southeast comer 17.6 114 2 100 95 <br /> 1 /27 2 ' west and 100' north of <br /> southeast comer 17.7 113 2 99 95 <br /> 13 04/27 20' west and 50' north of <br /> southeast comer 17.1 109 2 96 95 <br /> SP/SM Test Pad <br /> 14 04/27 50' west and 110' north of <br /> southeast comer 12.9 116 3 95 95 <br /> 15 04/27 50' west and 80' north of <br /> southeast comer 18.4 109 3 89 95 <br /> 16 04/27 50' west and 65' north of <br /> southeast comer 17.1 113 3 93 95 <br /> 17 04/27 50' west and 35' north of <br /> southeast comer 11.2 117 3 96 95 <br /> 18 04/27 50' west and 20' north of <br /> southeast comer 11.3 121 3 99 95 <br /> 40 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. <br /> In the absence of continuous observations of our personnel at the site, we can not express an opinion as to the adequacy of site <br /> preparation or overall fill compaction. we do not undertake the guarantee of construction, nor do we relieve the contractor of his <br /> primary responsibility to produce a completed project conforming to the project plans and specifications. <br /> Copyright 1993 Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.