My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-1008-49.001 <br /> June 22, 1993 <br /> Page 3 of 4 <br /> TABLE I <br /> SUNMARY OF FIELD DENSITY TEST RESULTS <br /> Dry Laboratory Specified <br /> Test Moisture Density Compaction Relative Relative <br /> No. Date Test Location % Dry Wt. P.C.F. Curve No. Compaction Compaction <br /> 19 04/27 70' West and 50' north of <br /> southeast comer 11.8 117 3 96 95 <br /> 20 04/27 70' west and 110' north of <br /> southeast corner 13.9 117 3 96 95 <br /> SM Test Pad <br /> 21 04/27 18' east and 40' north of <br /> southwest comer 15.3 ill 4 94 95 <br /> 22 04/27 18' east and 110' north of <br /> southwest comer 12.6 109 4 93 95 <br /> 240 /27 t and 25' north of <br /> southwest comer 14.6 111 4 95 95 <br /> 24 04/27 8' east and 80' north of <br /> southwest comer 17.6 103 4 88 95 <br /> 25 04/27 8' east and 120' north of <br /> southwest corner 11.1 113 4 96 95 <br /> 26 04/28 Retest #20 11.0 119 3 98 95 <br /> 27 04/28 Retest #21 12.1 119 3 97 95 <br /> 28 04/28 Retest #26 13.7 114 4 98 95 <br /> 29 04/28 Retest #27 13.9 118 4 100 95 <br /> 30 04/28 Retest #29 14.5 112 4 95 95 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. <br /> In the absence of continuous observations of our personnel at the site, we can not express an opinion as to the adequacy of site <br /> preparation or overall fill compaction. We do not undertake the guarantee of construction, nor do we relieve the contractor of his <br /> primary responsibility to produce a completed project conforming to the project plans and specifications. <br /> Copyright 1993 Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.