My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-1008-49 KLEINFELDER <br /> December 22, 1994 <br /> FINAL CQA REPORT <br /> HARNEY LANE SANITARY LANDFILL <br /> PRIMARY AND SECONDARY SITES <br /> SAN JOAQUIN COUNTY, CALIFORNIA <br /> INTRODUCTION <br /> Kleinfelder, Inc. provided testing and observation services at the Harney Lane Sanitary Landfill <br /> located on the south side of Harney Lane approximately 1 mile east of Jack Tone Road in San <br /> Joaquin County, California. The purpose of our observations was to serve as a third party <br /> Construction Quality Assurance (CQA) monitor during construction of foundation and low <br /> permeability barrier layers of the final cover at the Harney Lane Sanitary Landfill. Teichert <br /> Construction was the contractor retained by the San Joaquin County Department of Public <br /> Works, hereinafter "County", to perform final cover construction. <br /> The Harney Lane Sanitary Landfill, hereinafter "Landfill", is a Class III sanitary landfill owned <br /> by the County and operated under Solid Waste Facilities Permit No. 39-AA-0003 and Waste <br /> Discharge Requirement Order No. 93-093. The Central Valley Regional Water Quality Control <br /> Board (CRWQCB) recommended third party CQA during final cover construction. The <br /> CRWQCB and the California Integrated Waste Management Board (C ) comments led <br /> to the development of the revised CQA plan. Kleinfelder performed CQA in accordance with <br /> this plan. <br /> The final cover for the landfill was constructed of onsite native soils (foundation layer), or a <br /> mixture of onsite native soil and imported Ione clay (barrier layer). Test pads were constructed <br /> to evaluate construction methods and performance of the native/import mix design. Test pad <br /> results as well as field testing during construction of the foundation and barrier layers are <br /> presented in this report. <br /> PREVIOUS REPORTS <br /> The following previous reports have been submitted by Kleinfelder for the Harney Lane <br /> Sanitary Landfill closure: <br /> 1) "Construction Quality Assurance Plan for Construction of Final Cover, Harney <br /> Lane Sanitary Landfill, San Joaquin County, California," dated December 5, <br /> 1991, File No. 20-1008-49 <br /> 2) "Construction Specifications for Test Pad, Harney Lane Landfill, San Joaquin <br /> County, California," dated December 8, 1992, File No. 20-1008-49 <br /> Copyright 1994 Kleinfelder, Inc. Page i of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.