File No. 20-1008-49 <br /> December 22, 1994 <br /> Page 7 of 21 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subgrade(ft.) %Dry Wt. P.C.P. Curve No. Compaction Compaction <br /> BARRIER LAYER <br /> 217 9-6 N2720 E2705 -1.0 12.3 122 17 98 95 <br /> 218 9-6 N2820 E2795 -1.0 12.6 119 17 96 95 <br /> 219 9-6 N2810 E2715 -1.0 13.7 118 17 95 95 <br /> 220 9-6 N2905 32795 -1.0 12.6 119 17 96 95 <br /> 221 9-6 N2900 E2705 -1.0 12.6 119 17 96 95 <br /> 222 9-6 N3025 E2790 -1.0 12.1 124 14 98 95 <br /> 223 9-6 N3010 E2715 -1.0 11.4 121 14 95 95 <br /> 224 9-6 N3100 E2718 -1.0 12.4 121 14 96 95 <br /> 225 9-6 N3130 E2785 -1.0 12.6 119 17 96 95 <br /> 226 9-6 N3240 E2720 -1.0 12.5 120 17 97 95 <br /> 227 9-6 N3250 E2795 -1.0 12.9 121 17 97 95 <br /> 228 9-6 N3300 E2710 -1.0 12.8 122 17 98 95 <br /> 229 9-6 N3310 E2750 -1.0 12.5 120 17 97 95 <br /> 230 9-6 N3298 E2785 -1.0 12.9 121 17 97 95 <br /> FOUNDATIONAft <br /> LAYS <br /> 231 9-6 N1375 E1950 -2.0 8.9 112 23 94 90 <br /> 232 9-6 N2010 E1975 -2.0 9.1 110 23 92 90 <br /> 233 9-6 N2375 E1920 -2.0 9.4 112 23 94 90 <br /> 234 9-6 N2880 E1930 -2.0 8.4 112 23 93 90 <br /> 235 9-6 N3350 E1990 -2.0 8.9 112 23 94 90 <br /> BARRIER LAYER <br /> 236 9-7 N2175 E2645 -1.0 11.1 124 13 97 95 <br /> FOUNDATION LAYER <br /> 237 9-7 N1310 E1675 -2.0 5.3 117 22 90 90 <br /> 238 9-7 N1590 E1725 -2.0 8.3 114 26 97 90 <br /> 239 9-7 N2102 E1660 -2.0 5.3 116 26 99 90 <br /> 239 9-7 N2102 E1660 -2.0 5.3 116 26 99 90 <br /> 240 9-7 N2450 E1775 -2.0 6.0 115 26 99 90 <br /> 241 9-7 N2805 E1690 -2.0 6.5 116 27 93 90 <br /> 242 9-7 N3025 E1750 -2.0 7.0 115 27 92 90 <br /> 243 9-7 N3250 E1675 -2.0 8.8 114 27 91 90 <br /> 0 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1994 Kleinfelder,Inc. <br />