Laserfiche WebLink
File No. 20-1008-49 <br /> December 22, 1994 <br /> Page 8 of 21 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subsrade(ft.) %Dry Wt. P.C.P. Curve No. Compaction Compaction <br /> BARRIER LAYER <br /> 244 9-7 N3275 E2680 -1.0 14.0 116 24 97 95 <br /> 245 9-7 N3250 E2620 -1.0 14.0 116 24 97 95 <br /> 246 9-7 N3275 E2590 -1.0 14.0 116 24 97 95 <br /> 247 9-7 N3150 E2675 -1.0 15.2 116 24 97 95 <br /> 248 9-7 N3230 E2625 -1.0 14.6 116 24 97 95 <br /> 249 9-7 N3125 E2575 -1.0 11.1 123 13 97 95 <br /> 250 9-7 N3015 E2610 -1.0 12.2 123 13 97 95 <br /> 251 9-7 N3020 E2680 -1.0 13.0 120 14 95 95 <br /> 252 9-7 N3025 E2570 -1.0 12.3 122 14 97 95 <br /> 253 9-7 N2920 E2690 -1.0 14.5 117 24 98 95 <br /> 254 9-7 N2930 E2630 -1.0 14.6 116 24 97 95 <br /> 255 9-7 N2910 E2590 -1.0 13.9 117 24 98 95 <br /> 256 9-7 N2830 E2680 -1.0 13.9 116 24 97 95 <br /> 257 9-7 N2840 E2610 -1.0 12.9 121 14 96 95 <br /> 258 9-7 N2320 E2580 -1.0 12.3 122 14 97 95 <br /> 9-7 N2725 E2698 -1.0 12.9 121 14 95 95 <br /> 9-7 N2725 E2620 -1.0 13.9 117 24 98 95 <br /> 261 9-7 N2750 E2575 -1.0 13.3 116 24 97 95 <br /> 262 9-7 N2650 E2680 -1.0 13.9 117 24 98 95 <br /> 263 9-7 N2650 E2620 -1.0 14.6 116 24 97 95 <br /> 264 9-7 N2650 E2575 -1.0 14.6 116 24 97 95 <br /> 265 9-7 N2510 E2690 -1.0 13.7 118 18 98 95 <br /> 266 9-7 N2504 E2620 -1.0 13.8 117 18 97 95 <br /> 267 9-7 N2520 E2590 -1.0 12.3 122 14 97 95 <br /> 268 9-7 N2425 E2680 -1.0 13.7 118 24 99 95 <br /> 269 9-7 N2410 E2610 -1.0 13.7 119 24 99 95 <br /> 270 9-7 N2425 E2590 -1.0 14.2 119 24 99 95 <br /> 271 9-7 N2350 E2690 -1.0 15.0 117 24 98 95 <br /> 272 9-7 N2375 E2620 -1.0 13.7 118 24 99 95 <br /> 273 9-7 N2360 E2580 -1.0 10.0 125 13 98 95 <br /> 274 9-7 N2275 E2675 -1.0 11.1 124 13 97 95 <br /> 275 9-7 N2275 E2625 -1.0 10.6 124 13 97 95 <br /> 276 9-7 N2250 E2585 -1.0 10.6 124 13 97 95 <br /> 277 9-7 N2110 E2680 -1.0 11.1 124 13 97 95 <br /> 278 9-7 N2190 E2630 -1.0 11.7 124 13 97 95 <br /> 279 9-7 N2150 E2590 -1.0 10.5 125 13 98 95 <br /> 280 9-7 N2050 E2675 -1.0 13.9 117 24 98 95 <br /> 40 9-7 N2050 E2620 -1.0 14.5 117 24 98 95 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1994 Kleinfelder,Inc. <br />