Laserfiche WebLink
File No. 20-1008-49 <br /> December 22, 1994 <br /> ,Page <br /> 9 of 21 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subt{rade 00 %Dry Wt. P.C.P. Curve No. Compaction Compaction <br /> BARRIER LAYER <br /> 282 9-7 N2050 E2575 -1.0 13.9 116 24 97 95 <br /> 283 9-7 N1910 E2690 -1.0 13.9 117 24 98 95 <br /> 284 9-7 N1905 E2620 -1.0 14.6 116 25 98 95 <br /> 285 9-7 N1910 E2590 -1.0 14.0 116 25 98 95 <br /> 286 9-7 N1850 E2690 -1.0 14.0 116 25 98 95 <br /> 287 9-7 N1850 E2610 -1.0 13.5 116 25 98 95 <br /> 288 9-7 N1875 E2580 -1.0 14.0 116 25 98 95 <br /> 289 9-7 N1740 E2685 -1.0 12.5 120 17 97 95 <br /> 290 9-7 N1730 E2615 -1.0 12.2 123 13 97 95 <br /> 291 9-7 N1750 E2598 -1.0 11.5 125 13 98 95 <br /> 292 9-7 N1625 E2670 -1.0 11.0 125 13 98 95 <br /> 293 9-7 N1625 E2625 -1.0 14.1 115 24 96 95 <br /> 294 9-7 N1630 E2580 -1.0 13.9 116 24 96 95 <br /> 295 9-7 N1350 E2690 -1.0 13.9 117 24 98 95 <br /> 296 9-7 N1375 E2610 -1.0 12.6 124 14 98 95 <br /> 9-7 N1350 E2585 -1.0 13.2 122 14 97 95 <br /> 9-8 N1325 E2550 -1.0 14.6 120 17 97 95 <br /> 299 9-8 N1350 E2520 -1.0 14.5 121 17 98 95 <br /> 300 9-8 N1475 E2510 -1.0 14.9 122 17 98 95 <br /> 301 9-8 N1475 E2540 -1.0 14.1 120 17 97 95 <br /> 302 9-8 N1550 E2530 -1.0 14.7 119 17 96 95 <br /> 303 9-8 N1560 E2505 -1.0 15.0 121 17 97 95 <br /> 304 9-8 N1680 E2515 -1.0 13.2 119 29 97 95 <br /> 305 9-8 N1695 E2550 -1.0 13.2 119 29 97 95 <br /> 306 9-9 N1850 E2550 -1.0 13.5 116 24 97 95 <br /> 307 9-9 N1840 E2525 -1.0 14.2 114 24 96 95 <br /> 308 9-9 N2010 E2530 -1.0 14.7 115 24 96 95 <br /> 309 9-9 N2020 E2510 -1.0 14.0 116 18 96 95 <br /> 310 9-9 N2240 E2560 -1.0 14.2 119 18 99 95 <br /> 311 9-9 N2250 E2530 -1.0 14.1 115 18 96 95 <br /> 312 9-9 N2590 E2525 -1.0 13.4 121 29 98 95 <br /> 313 9-9 N2580 E2550 -1.0 13.6 119 29 97 95 <br /> 314 9-9 N3308 E2530 -1.0 15.9 114 9 97 95 <br /> 315 9-10 N3025 E2405 -1.0 12.1 119 29 97 95 <br /> 316 9-10 N1275 E2475 -1.0 11.7 124 31 99 95 <br /> 317 9-10 N1325 E2460 -1.0 12.9 121 31 96 95 <br /> 318 9-10 N1350 E2410 -1.0 12.3 122 32 97 95 <br /> 0 9-10 N1425 E2475 -1.0 13.6 119 32 95 95 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1994 IUeinfelder,Inc. <br />