Laserfiche WebLink
File No. 20-1008-49 <br /> December 22, 1994 <br /> *Page 13 of 21 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subgrade(ft.) %Dry WL P.C.P. Curve No. Compacti conviction <br /> BARRIER LAYER <br /> 426 9-14 N1150 E2190 -1.0 12.5 120 36 98 95 <br /> 427 9-14 N1295 E2125 -1.0 13.0 120 36 98 95 <br /> 428 9-14 N1295 E2160 -1.0 11.3 121 32 97 95 <br /> 429 9-14 N1295 E2195 -1.0 11.4 120 36 98 95 <br /> 430 9-14 N1400 E2102 -1.0 13.9 117 37 97 95 <br /> 431 9-14 N1400 E2125 -1.0 14.6 116 37 97 95 <br /> 432 9-14 N1400 E2175 -1.0 11.9 121 32 97 95 <br /> 433 9-14 N1575 E2110 -1.0 11.9 121 32 97 95 <br /> 434 9-14 N1575 E2150 -1.0 11.3 121 32 97 95 <br /> 435 9-14 N1575 E2195 -1.0 12.6 119 36 97 95 <br /> 436 9-14 N1700 E2125 -1.0 10.0 119 29 97 95 <br /> 437 9-14 N1700 E2150 -1.0 11.5 119 29 97 95 <br /> 438 9-14 N1700 E2195 -1.0 12.8 117 29 96 95 , <br /> 439 9-14 N1790 E2180 -1.0 13.0 120 29 98 95 <br /> 440 9-14 N1850 E2175 -1.0 10.7 123 39 98 95 <br /> 9-14 N1850 E2150 -1.0 11.9 121 39 96 95 <br /> 47 9-14 N1850 E2125 -1.0 11.0 125 39 99 95 <br /> 443 9-14 N1900 E2105 -1.0 10.7 123 39 98 95 <br /> 444 9-14 N1900 E2130 -1.0 10.7 122 39 97 95 <br /> 445 9-14 N2020 E2160 -1.0 12.9 117 40 97 95 <br /> 446 9-14 N2020 E2150 -1.0 13.4 117 40 97 95 <br /> 447 9-14 N2020 E2210 -1.0 12.0 120 40 99 95 <br /> 448 9-14 N2090 E2140 -1.0 14.6 116 40 96 95 <br /> 449 9-14 N2160 E2120 -1.0 11.2 122 39 97 95 <br /> 450 9-14 N2160 E2130 -1.0 11.2 122 39 97 95 <br /> 451 9-14 N2160 E2180 -1.0 12.0 120 39 96 95 <br /> 452 9-15 N2275 E2150 -1.0 12.0 120 29 98 95 <br /> 453 9-15 N2275 E2175 -1.0 12.4 121 29 98 95 <br /> 454 9-15 N2450 E2110 -1.0 11.3 121 29 99 95 <br /> 455 9-15 N2450 E2130 -1.0 12.6 119 29 97 95 <br /> 456 9-15 N2450 E2180 -1.0 11.4 121 29 98 95 <br /> 457 9-15 N2575 E2175 -1.0 12.6 119 29 97 95 <br /> 458 9-15 N2725 E2105 -1.0 12.4 121 29 98 95 <br /> 459 9-15 N2725 E2140 -1.0 11.4 121 29 98 95 <br /> 460 9-15 N2725 E2190 -1.0 11.4 120 29 98 95 <br /> 461 9-15 N3050 E2125 -1.0 12.6 119 29 97 95 <br /> 462 9-15 N3050 E2125 -1.5 13.4 117 29 95 95 <br /> 9-15 N1150 E2025 -1.5 9.9 127 13 99 95 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1994 Meinfelder,Inc. <br />