Laserfiche WebLink
File No. 20-1008-49 <br /> December 22, 1994 <br /> Page 14 of 21 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laborstory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subgrade(ft.) %Dry Wt. P.C.P. Curve No. Compaction Compaction <br /> BARRIER LAYER <br /> 464 9-15 N1150 E2050 -1.5 12.2 123 13 96 95 <br /> 465 9-15 N1150 E2075 -1.5 12.3 122 13 96 95 <br /> 466 9-15 N1225 E2080 -1.5 13.0 120 36 98 95 <br /> 467 9-15 N1225 E2050 -1.5 12.6 119 36 98 95 <br /> 468 9-15 N1310 E2030 -1.0 13.2 119 31 96 95 <br /> 469 9-15 N1425 E2060 -1.0 12.8 122 31 98 95 <br /> 470 9-15 N1430 E2095 -1.0 12.8 122 31 98 95 <br /> 471 9-15 N1425 E2010 -1.0 13.5 120 31 97 95 <br /> 472 9-15 N1525 E2005 -1.0 12.9 121 31 97 95 <br /> 473 9-15 N1525 E2060 -1.0 13.0 120 31 97 95 <br /> 474 9-15 N1525 E2090 -1.0 13.3 117 40 97 95 <br /> 475 9-15 N1620 E2080 -1.0 13.9 112 42 95 95 <br /> 476 9-15 N1620 E2040 -1.0 12.4 116 33 98 95 <br /> 477 9-15 N1620 E2005 -1.0 12.6 119 40 98 95 <br /> 478 9-15 N1800 E2050 -1.0 13.4 117 40 97 95 <br /> 9-15 N1960 E2080 -1.0 12.6 119 40 98 95 <br /> 4W 9-15 N1960 E2070 -1.0 12.1 119 40 99 95 <br /> 481 9-15 N1960 E2010 -1.0 12.4 121 32 96 95 <br /> 482 9-15 N1995 E2075 -1.0 13.6 115 42 98 95 <br /> 483 9-15 N2050 E2050 -1.0 11.4 121 32 96 95 <br /> 484 9-16 N2125 E2010 -1.0 12.8 122 32 97 95 <br /> 485 9-16 N2125 E2030 -1.0 14.1 120 36 98 95 <br /> 486 9-16 N2125 E2090 -1.0 12.9 121 36 99 95 <br /> 487 9-16 N2250 E2075 -1.0 12.9 121 36 99 95 <br /> 488 9-16 N2300 E2010 -1.0 13.6 119 36 98 95 <br /> 489 9-16 N2300 E2050 -1.0 14.8 118 36 97 95 <br /> 490 9-16 N2300 E2080 -1.0 16.0 117 41 99 95 <br /> 491 9-16 N2375 E2025 -1.0 16.8 115 41 98 95 <br /> 492 9-16 N2375 E2075 -1.0 16.9 115 41 97 95 <br /> 493 9-16 N2500 E2005 -1.0 12.9 121 40 100 95 <br /> 494 9-16 N2500 E2040 -1.0 13.0 120 40 99 95 <br /> 495 9-16 N2500 E2060 -1.0 13.2 119 40 98 95 <br /> 496 9-16 N2625 E2010 -1.0 13.7 118 40 98 95 <br /> 497 9-16 N2625 E2070 -1.0 14.2 119 36 97 95 <br /> 498 9-16 N2625 E2090 -1.0 15.3 114 42 97 95 <br /> 499 9-16 N2750 E2050 -1.0 15.2 116 42 98 95 <br /> 5 9-16 N2750 E2050 -1.5 15.9 114 42 96 95 <br /> 9-16 N2775 E2075 -1.0 17.1 114 41 96 95 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1994 Kleinfekler,Inc. <br />