Laserfiche WebLink
0 r <br /> ' Attachment 1 Harney Lane Landfill Inspection Photos 14 December 2009 <br /> 1. LF-1 —Southern end of cover deck. LFG flare and 2. Re-graded storm drain between LF-1 (right) and <br /> sedimentation basin (background). View to south. LF-2 (left). View to north. <br /> 3. Storm drain immediately upstream of detention 4. Drainage ditch on west side of LF-2. View to <br /> basin. View to south. south. <br /> AL <br /> 5. General area prepared for new groundwater well 6. <br /> MW-5. Storm water pond, migrant labor housing, <br /> and LF-1 in background. <br />