Laserfiche WebLink
01 <br /> B. SITE ACCESS <br /> The Contractor may access sites from Monday through Friday from 7:00 am to <br /> 5:00 pm excluding public holidays. Site access includes access by Contractor's <br /> workers and subcontractor, and delivery of material and equipment. Contractor <br /> shall lock gates at Harney Lane Landfill at the end of each working day. Failure <br /> to lock gates may result in vandalism or unauthorized dumping. The Contractor <br /> shall be responsible for such results of failure to lock the gate. <br /> C. COORDINATION WITH LANDFILL OPERATION. <br /> The North County Landfill will be in full operation when the work is in progress. <br /> The Contractor shall not inhibit or obstruct the flow of traffic or landfill <br /> operations. Contractor's foreman shall sign in at the gate and shall give a list of <br /> workers on site that day. Contractor's workers shall park as directed by the <br /> Engineer. <br /> D. USE OF THE SITE <br /> 1. Contractor shall collect meal trash and other litter generated by the <br /> Contractor daily. <br /> 2. Contractor shall distribute cuttings in the vicinity of the well to <br /> approximate the original contours in the vicinity of the well. <br /> 3. Contractor shall contain drilling mud, if used. <br /> 4. Contractor shall not use site telephones or other facilities. <br /> 5. Water for well construction and development is available on site. <br /> Contractor shall bring its water tank full on the first day. At the Harney <br /> Lane Landfill, SWD staff will show the operation of the well pump. <br /> 1.05 MOBILIZATION/DEMOBILIZATION <br /> A. Mobilization shall include: <br /> 1. Delivering to the landfill site and work areas all necessary equipment, <br /> tools, materials and supplies in good working order to each landfill. <br /> 2. Establishing a work force sufficient to commence and sustain the scope <br /> of work. <br /> 3. Ensuring proper operation and safety of drill rigs for the drilling location <br /> specified in the plans. Providing the driller's job foreman with a working <br /> cell phone. <br /> 4. Providing a container for the containment of refuse and debris. <br /> 5. Providing sanitary facilities for its workers. <br /> Construction Specifications San Joaquin County <br /> Groundwater Monitoring Wells Page 3 of 9 Public Works Dept <br /> Revised 11-23-09 Solid Waste Division <br />