Laserfiche WebLink
10/10/91 10:08 I 366 7013 SACRAMENTO _tj005/018 <br />Daily and intermediate cover will be used only during winter months to decrease the amount of <br />rainwater infiltration. Daily cover is not proposed during the summer because ASW and inert <br />waste are not putresible. Additionally, it is not anticipated that dust generation will normally <br />be a problem. If litter or dust becomes a problem during windy periods, daily cover will be <br />applied. <br />Although daily cover is not proposed for dry weather months, it will be applied during wet <br />weather periods to provide a surface to direct storm water which falls on waste in the pit to the <br />storm water removal sump in the west side of the pit (see comment J-1). The table below <br />shows the waste cell sizes and required cover for these cells. The requirements for cover on a <br />daily basis are shown for average, peak and site operational capacity ASW volumes stated in <br />A-3 of the RDSI. <br />WASTE <br />�'$icCck� <-»:$• v�+ra,: }� R:;�• �`• :3 <br />�• 'fig• g <br />v:: �4�%t•>:?<::d,'u'�•. �..�:'%'. • . <br />•%G>•:i>::b:3;.<v:y:<<':s:,..>.3'Y.: <br />.>.u..>.!•.•..•: :.. .,:.L. . ..C.<:: <br />...:..........:.<:c:.:S:;v.<: ...: .1�..;:<,1. ,. <br />.. ;r�4(?$j�.•. �x v,.vh. ,; <br />,.:v.: �.. ..y,., <br />.'�'.•Y��.:.. <br />..:;.: n.,; •r3:•i.b.•.......:.... •> •:.,�: <br />AND <br />: •` <br />::> :•. <br />3.G..• <br />;...... ,:.: <br />> <br />.�. <br />•..,:..-::.:. <br />COVER CALCULATIONS FOR COVE CONTRACTORS* <br />:' :c:....d> � , •+• : � ::; •�:,v:;w,.; .:::� ::aryj • • y .:oi`�C ♦' '� :y!•`vy3: ;2�iK: <br />o.� ,,- „� �t . ,> 1�.,• k • ..:-€t:<.:,>: , ::g: <br />,�.j •i� . '.� • :. . �: ?' . 9 i' d�'.'. 6 �'�je r,••�;, T :z..,>�,L����t <�8•�� <br />. ... y.. ....... .:�r.:%.::&. R....,r,` �.<'•$ . .�`�.•pk:��``•,,:„:i.R•�.>•,;.:<.:?.�.•,...:+sG.'>�J.:. a:C. rC..�;:.:.;.gy.' r..:.,.y..:. •�S. ,Cr�:S �A�fi,:.•-.', <br />..: z•: :,•:.�>Fk,25. ��..R�7 <br />n�.+ :.. fr•: :.,•.-x:... .w... :fr,::r,.,wr.-:t:>... :.,i A:t::`:; ,�enr;:•:a•:•;: ..;;.:::; :�a;<•:.,�. :..>. ��.�x:. •>: �: <br />;. S¢>. ...t... r�'..� •:: :,.. :..i .:::...:..::a,.o>..,?�. ..:•..: :.;R.q,.,.. :>.<.>.::.> ..f.v •:.Z.. ?::*....1:.::8:5:3:..-,. \• rp>>.. y<;. b.i?, <br />•$;¢, .3. .<, ..,Q.`�:�.,1•��?c� .F.:^6 '��> ..�.:,ly;. i;;<; f' ,::.$.:.$.�., � <.;>.Y.3: •, <br />:.,,�. fir. .:i!?•:>:::. ..r F: .T•.`: �. <br />:N'•':%,�:o:o:•,.-:;.. ;..`�.. >.a<..aS ;::s::•x:• �SCS::::;.q.x. •:`v . <br />.. , � � ::.:� Y. ......,:..,,....Z?:•>:5.•:•:r .::.`..-k..:....•..•�:i�i.A,aa.d::•::i1`.;::.: ,.K. ;..�sx.: •' a:F .a, n �:i%�iRG:. `:^ <br />Average Day <br />4 <br />20 <br />20 <br />59 <br />24 <br />720 <br />17 <br />Peak <br />6 <br />40 <br />40 <br />356 <br />142 <br />2560 <br />62 <br />Capacity <br />8 <br />60 <br />60 <br />1067 <br />427 <br />5520 <br />133 <br />Monthly <br />Average <br />4 <br />20 <br />20 <br />11851, <br />474 <br />8320 <br />200 <br />The estimated average monthly ASW volume is 1185 CY in-place. Assuming the average <br />waste cell size, 20 operating days per month and the assumptions listed with the Table, <br />approximately 200 CY of cover will be required monthly. (This may be conservative in that <br />operation may likely involve less than 20 days per month.) Assuming a cover requirement for <br />5 months out of the year, roughly 1000 CY of cover soil will be required for winter operation. <br />Accordingly, a stockpile of 1000 CY will be maintained by Cove Contractors at the site for <br />this purpose. <br />(1) Monthly based on 20 Operating days <br />(2) Based on conversion of 800 lb/cy <br />(3) Surface area requiring cover based on area of sides and top of cell dimensions <br />shown <br />(4) Cover estimates assume .5ft and 30% loss <br />Page 4 of 10 <br />copyright 1991 Kleinfeider, tne. <br />KLEINFELDER 3077 Fite Circle, Sacramento, CA 95827 (916) 366-1701 <br />